Warping & Sizing
Our high-performance yarn preparation plant, which was commissioned in 2001, makes it possible to manufacture warps of the highest quality.
In addition to warping and winding machines, SETEX has a high-temperature warp-beam bleaching unit with a capacity of around 1000 kg and a sizing facility with a maximum useful width of 425 cm.




